CALTEX JET PIPELINE STAGE 2

"With many construction projects ongoing in the area, Pipeline Drillers worked with stakeholders and existing contractors to complete HDD works in accordance with the client's expectations and schedule." - Project Director, John Whitbread

Pipeline Drillers has recently completed Stage 2 of the Caltex Jet Fuel BCC Pipeline. The 10" Pipeline from the Brisbane River to Lomandra Drive Pinkenba was installed over a series of bores for a total of 1500m.

 

As always, Safety was a primary focus for this project. Collaboration with the client and contractors was key to the project receiving recognition as a completely incident free site. This achievement was made possible in no small part by the efforts of all Site Personnel and the guidance of the onsite Safety Managers, quoted as saying "this project was given the time to ensure safe operational procedures were implemented correctly"

 

Pipeline Drillers' environmental performance at Stage 2 was outstanding. The clients' initiative to complete daily environmental reports in addition to general daily reporting was welcomed by Pipeline Drillers. This tool became crucial to the environmental success of the project, giving Site Personnel and Management the opportunity to review the potential impacts of HDD operations on the environment and take immediate steps to mitigate potential incidents.

 

 

CLIENT:

LOCATION:

DURATION:

CROSSING UNDER:

PRODUCT:

PRODUCT PIPE:

BORE LENGTHS:

GEOLOGY: