Project Media Gallery

Kawana Way

 

This short video highlights the installation of the 900 millimetre HDPE pipe 1,200 metres from the multi-modal transport corridor just south of the Mooloolah River and extending south to the exit adjacent to Living Choice near the Parrearra Channel bridge.  
 

Nicklin Way

 

This short video showcases the installation of the highly anticipated 1.6 kilometre Nicklin Way section of the new Caloundra Sewerage Pipeline, said to be the largest and longest horizontal directional drilling installation in Australia. The HK HDD250t drill rig endured extremely hard rock to enlarge the borehole to a final diameter of 1200 millimetre, before the American Augers DD1100 pulled through the 900 millimetre HDPE within 72 hours.
 

Mooloolah River Crossing 

 

This short video showcases the installation of 900 millimetre HDPE pipe under the Mooloolah River which took place in October. In half a day, the pipe was pulled through 315 metres from the Kawana Way multi-modal transport corridor to the Brightwater Sports Ground.  

Wyuna Canal Crossing 

 

This short video highlights Pipeline Drillers installing the 900 millimetre HDPE pipe under the Wyuna Canal, extending 908 metres from the Kawana STP to the western side of Kawana Way.  

Caloundra Sewerage Pipeline Project

 

Take a look at the trenching, pipe fabrication and horizontal directional drilling works in progress and completed for this 2.4 kilometre pipeline installation at Caloundra.

Hold your mouse over image to view slideshow or click to view in detail.

Mountain Creek to Kawana Sewerage Pipeline Project

 

This album features various photos of the construction and horizontal directional drilling works in progress and completed across the 5 sections of this 3.2 kilometre pipeline installation.

 