Brisbane River Fuel Line
AMPOL | Brisbane, QLD | Jan – Feb 2022
Scope
8” steel pipeline installed via a 1,030 m HDD crossing beneath the Brisbane River.
Challenges
Due to the entry angle of the bore hole, Pipeline
Drillers required the assistance of a number of cranes
to help guide the welded pipeline into position ready
for installation into the bore hole.
Outcome
This 1,030 m bore was drilled and installed within 18
days. Successful installation within budget and with
no Health, Safety or Environmental incidents.
-
8” STEEL PIPE
-
1,030m BORE
-
MARINE CLAYS