top of page
Core Capabilities

Pipeline Drillers Group specialises in the trenchless installation of pipelines and utilities using horizontal directional drilling (HDD). The company has vast experience delivering technically demanding crossings where ground conditions, environmental constraints or surface infrastructure make conventional open-cut construction impractical or undesirable. Delivering over 1,000 bores nationally since 1999, Pipeline Drillers Group has built a reputation for quality, integrity and innovation.

The business primarily undertakes medium to large HDD installations, typically involving bore lengths between approximately 200 metres and 2,500 metres. Projects commonly involve the installation of steel and HDPE pipelines across a wide range of ground conditions including clay, sand, shale and hard rock formations.

 

Pipeline Drillers Group delivers HDD works across a range of infrastructure sectors including water and wastewater networks, energy pipelines, utilities infrastructure and marine outfalls. Installations frequently involve crossings beneath rivers, creeks, highways, rail corridors, coastal environments and other constrained infrastructure corridors.

OPT_Mono_Rig & Sunset.jpg
OPT_Mono_site 10.jpg

The company provides a comprehensive HDD delivery capability encompassing project planning, bore design, drilling execution and pipeline installation. This capability includes drilling methodology development, pipe preparation and welding, installation of steel and HDPE product pipe including pneumatic hammering for large steel casing, final testing and commissioning of installed pipelines.

Pipeline Drillers Group operates within a clearly defined service offering and focuses on projects aligned with its technical strengths and resources. The company undertakes HDD installations across a wide range of project scales, with a strong focus on technically challenging works where experience, specialised equipment and disciplined planning are critical to successful delivery.

HDD DESIGN & ENGINEERING

 

Bore profile development, alignment planning and engineering review

DRILLING METHODOLOGY

Methodology development, risk control planning and drilling strategy

GROUND & ASSESSMENT

 

Ground condition review, service mapping and site constraint analysis

HDD INSTALLATION

 

Trenchless pipeline installation using HDD methods across varying ground conditions

PIPE RAMMING WITH PNEUMATIC HAMMERING

 

Installing steel product pipes in extremely challenging ground conditions without the significant disturbance of trenching

INFRASTRUCTURE CROSSINGS

 

Rivers, highways, rail corridors and major utility infrastructure

PIPE PREPERATION & WELDING

 

Steel welding, HDPE welding and pipeline preparation support activities

TESTING & VERIFICATION

 

Pressure testing, system verification and project completion checks

HDD PROJECT MANAGEMENT

 

Planning, coordination and delivery oversight across HDD installation projects

bottom of page