top of page
Manning River Crossing

Eire | Manning River, NSW | Aug – Nov 2025

Scope

​

Installation of a 560mm water transport pipeline beneath the
Manning River using HDD, comprising a single bore of 724m.

 

Challenges

​

The crossing required steel casing installation using a hammer drill, together with ParaTrack beacon steering to maintain bore alignment. Delivery also involved complex site and stakeholder management, including traffic and noise controls.

 

Outcome

​

The 724m HDD crossing was completed to enable installation of the water transport pipeline beneath the Manning River. The works were delivered using a controlled approach suited to the site and stakeholder requirements, providing a more resilient solution for the town of Wingham following flood damage to the existing water supply and reducing the risk of future flood impacts.

  • OCEAN OUTFALL
     
  • 330m BORE
     
  • 315mm PIPE
OPT_Mono_mr93.jpg
OPT_Mono_Manning River Underbore Abbotts Road Drone Aerial 28-8-25 (1).jpg
bottom of page