Taswater Launceston (Tamar River)
TasWater | Launceston, TAS | Jul – Nov 2022
Scope
Installation of sewer rising mains beneath the
Tamar River using HDD, including two major
crossings of 660m and 1,100m.
Challenges
Challenging ground conditions includingboulders, unstable soils and cobbles requireddeep bore alignment, casing installation andnon-standard entry and exit angles.
Outcome
Pipelines successfully installed with minimal disruption to the surrounding environment, existing infrastructure and pre-existing systems, with no safety incidents reported during delivery.
-
RIVER CROSSING
-
660m & 1,100m BORES
-
900mm HDPE